ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsSlab Formwork Systems

Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

China Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley supplier
Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley supplier Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley supplier

Large Image :  Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

Product Details:

Place of Origin: China
Brand Name: ZNLS
Certification: ISO9001-2008
Model Number: SA-TRS

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Material: Steel Price:: Negotiation
Delivery Time:: After Deposit 15-20 Days Lifting Type: Rack And Pinion Mechanism
Bearing Capacity: 1500kg Max. Lifting Height: 690mm

Detailed Product Description


suspended slab formwork

slab formwork

concrete slab formwork

 

Safe , Fast Operation by Using Shifting Trolley for Table Formwork in Slab Construction

Description:

1. Brief introduction

Shifting trolley is special shifting equipment for table formwork, as we know, in slab construction, we usually divide several construction sections for money saved, that makes turnover of slab formwork be very necessary. The speed of moving of table formwork is accelerated by means of shifting trolley, that is why we designed this smart tool.Construction Suspended / Concrete Slab Formwork Systems Shifting Trolley

 

2. Competitive advantage

①.The construction efficiency is improved.

 

As the picture above shown, the table formwork will be carried by trolley safely, quickly and easily; usually, the shifting of each block of table form will be finished only by one labor and one trolley, the speed of construction is accelerated and the engineer cost is lowered.

②.Omni-directional wheels make moving easier.

The direction will be controlled by labor in the moving process of trolley, there are Omni-directional wheels to make it easily achieved.

③.It is an auto-lifting car.

The trolley will go up and down by its own device. It is very easy to operation just by controlling control panel which marked “UP” and “DOWN”.

 

 

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: Leo

Tel: +8615705272323

Send your inquiry directly to us (0 / 3000)