ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsShoring Scaffolding Systems

High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

China High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading supplier
High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading supplier High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading supplier

Large Image :  High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: post shore

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Raw Material: Q235 Steel Pipe Finishing:: Electric Galvanized
Application: Vertical Load Bearing Size:: Prop 30-350
Adjustment Type: By Thread And Regulating Holes Auxiliary: Tripod

High Capacity Post Shore of 3.5 m for Supporting Decking Formwork Systems

 

The high load capability makes ZNLS props the top choice offering reliability and safety for any construction job.

Excellent quality is guaranteed by using high quality of raw materials, the manufacturing process and final treatment applied to the props, which result in safe and efficient use on sites.

The manufacture of Telescopic Props is certified in accordance with standard EN 1065.

Important Instructions:
• Respect the prop spacing in accordance with the project.

• Prop load capacities and engineer’s design must be observed.

• The load acting on the prop is vertical and centred. No horizontal loads act on the prop.

• Check formwork and prop erection before concrete pouring.

• Pouring has to be done from heights which do not cause strong shaking of the formwork or the props.

• Avoid the sudden emptying of the concrete bucket onto the formwork.

• Formwork stripping and prop removal is only carried out when the concrete strength is sufficiently high.

• Before starting any dismantling operation, check the state of the props.

• After removal, props should not be irregularly piled up.

 

High Capacity Scaffolding Steel Prop , Adjustable Props Heavy Duty 30KN Loading

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: Leo

Tel: +8615705272323

Send your inquiry directly to us (0 / 3000)