ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAutomatic Climbing System

Advanced Design Automatic Climbing System For High Building AC50-2

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

Advanced Design Automatic Climbing System For High Building AC50-2

China Advanced Design Automatic Climbing System For High Building AC50-2 supplier

Large Image :  Advanced Design Automatic Climbing System For High Building AC50-2

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: PF-AC50

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Raw Material: Steel Surface Treatment: Powder Coated
Lifting Method: Self Climbing , Hydraulic Drive Load Capacity: 5 Tons
Integrated Platform No.: 4 Platforms For Independent Work Climbing Rail: Different Length Available

AC50-2 Automatic climbing formwork - Fast, efficient auto-climbing formwork system for High Building

 

Overview

Auto-climbing system AC50-2 is composed of formwork system, bracket system, hydraulic system, anchor system. It guarantees simple procedure of assembly and climbing without any lifting machine, so it is the best choice for construction.

 

Characteristics

1 . The self-climbing hydraulic is equipped with an operating platform. As such, workers are not required to do the set-up and this help to save on manpower and materials.

2 . There is low error rate in the construction of the structure. Errors can be easily rectified at each level.

3 . The formwork is able to climb automatically and to be cleaned onsite. As such, this will significantly increase crane operational efficiency.

 

Climbing Process Flow

1 . Erect formwork, use cone suspension and lateral bracing to secure the formwork. Commence the first round of concrete pouring.

2 . Dismantle the formwork and install the Anchor shoe. Lift the bracket and formwork, install the middle platform, position the formwork correctly and commence on the second round of concrete pouring.

3 . Raise the formwork and brackets to a higher level, attached the guard rail, hydraulic system and suspended platform.

4 . Close formwork and commence on the third round of concrete pouring.

5 . Dismantle the formwork and shift it backwards, attached it on the wall and climb rail.

6 . The Brackets reached its designated position.

7 . Close formwork, commence on the concrete pouring, and the standard climbing process commences.

 

Advanced Design Automatic Climbing System For High Building AC50-2

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: sophia liu

Send your inquiry directly to us (0 / 3000)