ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsAutomatic Climbing System

Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50

China Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50 supplier

Large Image :  Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: PF-AC50

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Raw Material: Steel Surface Treatment: Powder Coated
Lifting Method: Self Climbing , Hydraulic Drive Load Capacity: 5 Tons
Integrated Platform No.: 4 Platforms For Independent Work Climbing Rail: Different Length Available

AC50-3 Automatic climbing formwork - Cost ef­fec­tive thanks to sim­ple op­tions for com­bin­ing

 

Overview

AC50-3 Automatic climbing formwork is used for lifting up working platforms and wall forms from floor to floor without using a crane when casting concrete walls especially on highrise buildings.

 

Introduction

This system can reduces tower crane time and accelerates the production. Procides a secure area for material loadings. Ensures safe working conditions. Includes standard component which permit adaptation to any other constrction project.

 

Characteristics

1. The AC50-3 Automatic climbing formwork is able to climb as a whole or separate unit. The climbing process is stable, consistent and safe.

2. The AC50-3 Automatic climbing formwork is able to climb vertically or inclined and has fast climbing speed.

3. The working unit does not need to set up an operating platform as the self-climbing hydraulic is equipped with it. As such, this will save on construction materials and manpower.

4. There is low error rate in the construction of the structure. Errors can be easily rectified at each level.

 

Value-added Service

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

 

Fully Automatic Climbing Wall , Jump Form System Construction PF-AC50

 

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: sophia liu

Send your inquiry directly to us (0 / 3000)