ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsClimbing Formwork System

Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems

China Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems supplier

Large Image :  Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: PF-J160

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Material: Steel Surface Treatment: Powder Coated
Lifting Method: By Crane Bracket Width: 1.6m
Usage Field: Media Height Building With Limited Space Application: Cantilever Working Platform To Support Wall Form

J160-2 Jumped climbing formwork - Simple moving procedure by crane

 

Overview

Jumped climbing formwork J160-2 is mainly used in the concrete casting in high-rise buildings structures. The lateral pressure of the concrete is supported by the anchor and high tensile bolt. The formwork does not require additional measures to secure it. A large surface area is covered for a one-time altitude concrete pouring. It is a simple and fast process where the concrete has a smooth finishing which is durable and cost-effective.

 

Characteristics

1 . The support structure, load of the bracket, formwork and other materials are all supported by the anchor and the use of the scaffolding is not required.

2 . The tripod can be folded. It is quick to assemble and dismantle, convenient to store, transport and reusable.
3 . Through the strong connection of formwork together with the climbing scaffold, both can be moved as a single climbing unit by crane. Thus valuable time-savings can be achieved.

 

Value-added Service

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.Simple Moving Cantilever Scaffolding System , Hanging Scaffolding Systems

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: sophia liu

Send your inquiry directly to us (0 / 3000)