ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsWall Formwork System

W-SF120 Scaffolding Concrete Formwork , Concrete Wall Formwork Long Life Span

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

W-SF120 Scaffolding Concrete Formwork , Concrete Wall Formwork Long Life Span

China W-SF120 Scaffolding Concrete Formwork , Concrete Wall Formwork Long Life Span supplier

Large Image :  W-SF120 Scaffolding Concrete Formwork , Concrete Wall Formwork Long Life Span

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: W-SF120

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 6000 to 8000 square meters per month
Contact Now
Detailed Product Description
Material: Steel Frame, Plywood Size: Modular Size Or Custom-made
Assembly Type: Clamp Reuse Times: More Than 60 Times
Thickness: 120mm Application: Concrete Construciton-Cast In Place Wall

120 Steel frame wall formwork-2 - Extremely long life span , more repeat uses

 

 

Overview

 

120 Steel frame wall formwork-3 with adjustable clamp is used for the concreting of different walls. It can be designed and set up flexibly to meet different demands.

 

Characteristics

 

1. Highly strengthened, the wall formwork can bear 60 KN /m2.

2. A Modular Steel Frame Wall Formwork, flexible to assemble and reset.

3. Concrete surface is perfect, as the plywood is screwed on from the back when connected with frame.

 

Value-added Service​

 

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.

 

W-SF120 Scaffolding Concrete Formwork , Concrete Wall Formwork Long Life Span

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: sophia liu

Send your inquiry directly to us (0 / 3000)