ZNLS ENGINEERING CO., LTD.

             ZNLS ENGINEERING

 MOST EXCELLENT FORMWORK SOLUTION

Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsClimbing Formwork System

C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

Good quality Wall Formwork System for sales
Good quality Wall Formwork System for sales
I'm Online Chat Now

C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

China C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment supplier

Large Image :  C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

Product Details:

Place of Origin: China
Brand Name: ZNLS
Model Number: PF-C240

Payment & Shipping Terms:

Minimum Order Quantity: 25 tons
Price: Negotiation
Packaging Details: In bundle or pallets, or by customer demands
Delivery Time: 14 to 21 days after deposit
Payment Terms: 30%TT, Balance against copy of BL
Supply Ability: 400 to 500 tons per month
Contact Now
Detailed Product Description
Material: Steel Surface Treatment: Powder Coated
Lifting Method: Platform With Wall Form In One Crane Lift Bracket Width: 2.4m
Retrusive Distance: 0.65m Climbing Rail: Available

C240-3 Rail climbing formwork - Easily assembled, saves time and money

 

Overview

It is mainly used in the concrete casting in the structures of bridges, high-rise buildings. The lateral pressure of the concrete is supported by the anchor and high tensile bolt. The formwork does not require additional measures to secure it. A large surface area is covered at a one-time altitude concrete pouring. It is a simple and fast process where the concrete has a smooth finishing which is durable and cost-effective.

 

Characteristics

1 . The formwork can be reversed to 650mm as a unit.

2 . The formwork and steel waler are able to be reversed as an unit; as such, it is easy to clean the panel, tighten of steel and etc.

3 . The formwork is flexible to use; it can be adjusted in all directions according to the structures.

 

Value-added Service

ZNLS will provide relating technical service including formwork & scaffolding proposal drawing, material list, shop drawing, calculation sheet, loading capacity analysis and assembly instruction on site and other after-sale service. Moreover, cargo transport arrangement and tracking, relating import and export documents will be supplied as customs’ requirements.C240-3 Rail Climbing System Easily Assembled Powder Coated Surface Treatment

Contact Details
ZNLS ENGINEERING CO., LTD.

Contact Person: sophia liu

Send your inquiry directly to us (0 / 3000)